Challenge
A bank whose IT department was growing into a service provider for the group’s entities needed a new, future-proof data centre that could grow with that ambition.
Approach
- Validated the IT strategy.
- Drew up a formal statement of requirements for reliability, capacity, scalability and security.
- Reviewed the design documents of the new building and aligned the data centre scope with the general building contractor.
- Developed the concept design: architecture, electrical systems, cooling, racks, cabling, security systems, and monitoring and management.
Result
A data centre design that matched the bank’s growth plans, with a clear division of scope between the data centre and the building works.
Facing a similar challenge?
A short call is often enough to see whether I can help.