Challenge
A bank with 193 branches invested in a new main production data centre and, at the same time, a small remote disaster recovery site for its critical applications.
Approach
- Made the detailed design of the main data centre and the DR server room.
- Supervised the construction of both sites, delivered turnkey: civil works, electrical systems, cooling, security, racks, monitoring and cabling.
- Carried out testing and commissioning.
Result
A new main data centre and DR site, delivered in less than a year, greatly improving the reliability of the IT systems behind the bank’s branches.